True Dominion Enterprises Ltd


Monday, 23 November 2015

Why Warri port channel can’t be dredged now— NPA

Why Warri port channel can’t be dredged now— NPA
13 November 2015, Lagos – The Nigerian Ports  Authority, NPA, has blamed the delay in the dredging of the channel leading to the port in Warri, Delta State, to the low level of the river which makes the siltation (rate of return of sand to the channel after dredging) level very high. Managing Director of […] More »

No comments :

World Energy Consumption